SAP Certified Application Associate - SAP IBP for Supply Chain (2302) 認定 C-IBP-2302 試験問題:
1. You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.
A) Add the system name and tenant information from the About section to the Home page.
B) Defining a different default planning area via the User Preferences.
C) Having a different set of tiles in the Home group of apps.
D) Setting a separate theme for the Home page in the Web UI.
2. You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
A) Add a new time profile level to the time profile.
B) Change the description of the attributes in the time profile.
C) Change the past and future horizon of the levels in the time profile.
D) Change the numbering hierarchy of the period IDs in the time profile.
3. You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
A) A time profile has to be activated so that the application job can proceed.
B) In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
C) The assigned Planning Area must be active.
D) This application job can be run for multiple time profiles at once.
4. Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
A) A planning area with its time profile must be bundled in one collection.
B) You should delete collections after they have been transported.
C) A planning area with the copy operators assigned must be bundled in one collection.
D) Configuration items should be bundled in the collections based on the SAP IBP project stream.
5. What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
A) Use production lead times and offsets to manage components at the outsourced manufacturing location
B) Model target inventory and stocks at the outsourced manufacturing location
C) Ensure that the outsourced manufacturing locations have a separate subnetwork
D) Model relative production costs across internal locations and outsourced manufacturing locations
質問と回答:
| 質問 # 1 正解: A、D | 質問 # 2 正解: B、C | 質問 # 3 正解: B | 質問 # 4 正解: A、C | 質問 # 5 正解: D |














704 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。