IBM Business Process Manager Advanced V7.5, Integration Development 認定 C9550-270 試験問題:
1. An integration developer needs to monitor a particular component via Common Event Infrastructure (CEI) because an unexpected behavior has been observed. This component has not been monitored until now. Which task should the integration developer perform to diagnose the problem without any service interruptions?
A) Enable needed events via the Common Event Browser application.
B) Using IBM Integration Designer (IID), select the events to bemonitored in the component and deploy the component again.
C) In the administrative console, go to Logging and tracing. Click Change Log Detail Levels in the Runtime tab. Select the events to monitor and the level of detail.
D) In the administrative console, go to SCA modules under Applications and select the needed component. Select Module Properties and enable CEI Events.
2. An integration developer needs to implement a parent task and a subtask inan integration solution. Refer to the following exhibit:
What task does the integration developer need to perform to enable the Enable subtask creation check box?
A) Click the Select Date button and enter a valid date.
B) Delete the parent task and create a newto-do task
C) Select the Task can be delegated check box.
D) Create the subtask before creating the parent task and add a reference in the parent task Propagation tab.
3. An integration developer has configured a BPEL business process for a customer, as shown below:
Assume that max is greater than min. What should the integration developer take into account when implementing this for each loop?
A) There must be an array associatedwith the for each loop.
B) The values of min and max cannot be changed once the for each activity begins.
C) It is possible to exit the loop before Index is equal to max.
D) If the scope inside of the for each activity is set to isolated, then the activities will run sequentially.
4. During acceptance testing of an integration solution, various errors in the mediation flows were discovered. While correcting these errors, the development team found that little or no error handling was present within the mediation flows. Therefore, a new requirement is introduced to handle every exception within any mediation flow in exactly the same way by logging the exception to a file. How can an integration developer implement this requirement?
A) Create a mediation subflow containing the exception handling logic, andconnect every fail terminal to this new subflow.
B) Create a mediation subflow containing the exception handling logic, and connect the error input node of each mediation flow to this new subflow.
C) Create a mediation flow containing the exception handling logic, and invoke it whenever an error occurs.
D) Connect a trace primitive to each fail terminal.
5. An integration developer is testing a long-running process applicationfor a customer. When the business process receives a request, it invokes several other SCA services. During integration testing, the developer finds that an unexpected failure has occurred. Which troubleshooting method gives the integration developer a detailed hierarchal view of the invocation record, including input and output data?
A) Enable cross-component trace (XCT)with the Data Snapshot option.
B) Change the log detail level to the SCA.* option in the running server.
C) Put breakpoints at various places in the business process.
D) Load all the other integrated SCA services in the business process to the same workspace.
質問と回答:
| 質問 # 1 正解: C | 質問 # 2 正解: B | 質問 # 3 正解: D | 質問 # 4 正解: B | 質問 # 5 正解: A |














960 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。
