ISQI CTAL-TA_V4.0 試験概要:
| 認定ベンダー: | ISQI / ISTQB |
|---|---|
| 試験名: | ISTQB Certified Tester Advanced Level Test Analyst (CTAL-TA) v4.0 |
| 試験番号: | CTAL-TA_V4.0 |
| 試験形式: | 多肢選択式問題, K1~K4の認知レベルに基づく出題, 持ち込み不可の閉本試験 |
| 合格点: | 51点(総得点78点の約65%) |
| 関連資格: | ISTQB Certified Tester Foundation Level (CTFL) ISTQB Certified Tester Advanced Level Test Manager ISTQB Certified Tester Advanced Level Technical Test Analyst |
| 認定の有効期間: | 有効期限なし(終身有効) |
| 対応言語: | フランス語, 中国語, スペイン語, 英語, 日本語, ドイツ語, ポルトガル語 |
| 出題数: | 45問 |
| 受験料: | 250~350米ドル(地域や試験実施機関により異なります) |
| 試験時間: | 120分(母国語以外の受験者は150分) |
| 推奨トレーニング: | ISTQB 認定トレーニング実施機関一覧 CTAL-TA v4.0 シラバス |
| 受験申し込み: | ISQI 試験登録 ISTQB 加盟団体 |
| サンプル問題: | ISQI CTAL-TA_V4.0 サンプル問題 |
| 受験方法: | オンラインによる監督付き受験、または認定試験会場での対面受験 |
| 前提条件: | ISTQB Certified Tester Foundation Level (CTFL)の資格を保有していること(v4.0が推奨されますが、旧バージョンでも可)。最低6か月程度の実務的なテスト経験が推奨されます |
| 公式シラバスのURL: | https://istqb.org/certifications/certified-tester-advanced-level-test-analyst/ |
ISQI CTAL-TA_V4.0 試験シラバストピック:
| セクション | 比重 | 目標 |
|---|---|---|
| テストの実装と実施 | 10% | - テストの実施と結果の記録 - 欠陥の登録と根本原因分析への支援 - テスト手順およびテストケースの作成 - テストデータの準備と管理 |
| テスト結果の評価と報告 | 9% | - テストプロセスと欠陥検出能力の改善 - テストの進捗状況と品質状態の報告 - テスト結果と網羅性の分析 - 要求事項およびリスクに対する網羅範囲の確認 |
| リスクに基づくテストにおけるテストアナリストの業務 | 15% | - リスクに基づくテストの優先順位付けと範囲の定義 - 製品リスクの分析と評価 - 変更の影響度に基づく回帰テストの範囲設定 |
| テスト分析とテスト設計 | 51% | - 経験に基づくテスト技法と欠陥予防手法
|
| ソフトウェア開発ライフサイクルにおけるテストアナリストの役割 | 15% | - 各SDLCモデルにおけるテストアナリストの業務 - 成果物の作成と関係者との連携 - テスト戦略および計画の策定への関与 |
ISQI ISTQB Certified Tester Advanced Level Test Analyst (CTAL-TA v4.0) 認定 CTAL-TA_V4.0 試験問題:
問題 #1
You are working on a project to build a purchasing system. The main requirements for the system are that it shall:
* Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
* Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it or return it for clarification / modification.
* Forward approved requests to the Purchasing Department.
* Allow purchasers to find the best available supplier for each approved request and place the request on that supplier as a purchase order.
The solution is being developed according to the company's traditional V-model methodology. The requirements are clearly documented and include a business process model.
The main release has now been live for three months and you are working on the first maintenance release.
The test manager has asked you, the senior TA, to identify those parts of the test process which were most and least effective at finding defects in the main release.
You have collected statistics for the independent test activities, i.e. excluding developers' testing, including only the 178 defects in the three highest of your five defect severity levels. The results are presented in the table below:
Assume that all defects not found at the first opportunity could have been, e.g. that all defects that escaped into acceptance testing were within the scope and objectives of system testing. By applying Defect detection percentage (DDP) analysis, which test activity was LEAST effective?
A. Acceptance testing
B. Test design, including solution design review
C. Test analysis, including requirements review
D. System testing
問題 #2
You are developing test cases for an application which performs complex calculations and have decided to model these calculations on a spreadsheet, to determine expected results from inputs.
Which solution to the test oracle problem BEST describes the approach you are using?
A. Metamorphic testing
B. Deterministic testing
C. A pseudo-oracle
D. Property-based testing
問題 #3
In which of the following circumstances is the transition from a high-level test case to a low-level test case MOST LIKELY to be deferred from test design to test implementation?
A. When product risk analysis has not been completed
B. When specific test data are needed for the test case
C. When the details required depend on the test execution schedule
D. When the person who runs the test will not be its author
問題 #4
You are working on a project to build a purchasing system. The main requirements for the system are that it shall:
* Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
* Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it or return it for clarification / modification.
* Forward approved requests to the Purchasing Department.
* Allow purchasers to find the best available supplier for each approved request and place the request on that supplier as a purchase order.
The solution is being developed according to the company's traditional V-model methodology. The requirements are clearly documented and include a business process model.
System testing has finished and the test manager has asked you, the senior TA, to identify any parts of the product that should be focused on during acceptance testing. The results of this may be used to adjust the acceptance test plan.
You are using defect cluster analysis, only counting defects with severity levels 1 to 3, ignoring low severity levels 4 and 5. Function point analysis was used for estimating, so you have used function points as the unit of size for the various functional areas of the product. No numeric estimates of expected defect quantities were made for them individually but, as a result of product risk analysis, these functional areas have been ranked according to the amount of product risk that was predicted in them, with risk ranking 1 being the highest and
5 the lowest; the thoroughness of the testing performed so far has been proportional to that. The results are presented in the table below.
Functional area
Total function points
Product risk ranking
Defects found
Purchase Request entry
2000
2
30
Purchase Request workflow
1500
4
15
Purchase Request authorisation
1000
5
25
Supplier identification
2000
1
30
Purchase Order creation
1000
3
30
Which functional areas would you recommend for more test focus in acceptance testing?
a) Purchase Request entry
b) Purchase Request workflow
c) Purchase Request authorization
d) Supplier Identification
e) Purchase Order creation
A. a) and b)
B. c) and e)
C. a) and d)
問題 #5
The following minimized decision table shows the rules for rewarding members of a hotel's loyalty scheme who have booked a room, according to the type of room (luxury or not) and/or whether they have prepaid for breakfast (yes or no). The loyalty scheme has tiers Bronze, Silver and Gold. All combinations are feasible.
Using the checksum procedure, what do you notice about the structure of the minimized table?
A. The table may have been minimized correctly
B. The decision table is incomplete, in the sense that at least one condition value is not represented in any of the rules
C. There are additional rules that are not shown
D. There is rule overlap, in the sense that one combination is covered by > 1 rule, or additional rules are not shown
解説:
| 問題 #1 正解: C | 問題 #2 正解: C | 問題 #3 正解: B | 問題 #4 正解: B | 問題 #5 正解: D |














789 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。