Nutanix Certified Services Core Infrastructure Professional 認定 NCS-Core 試験問題:
1. A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.
The consultant is not allowed to use the consultant's own flat switch in the customer's environment.
Which step should the consultant take to resolve this issue?
A) Image each node individually with Foundation VM.
B) Connect to the top of rack switch and discover the nodes with IPv4.
C) Bare metal image all nodes with Foundation VM.
D) Open a console to all nodes and statically assign IP addresses.
2. A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.
Which ESXi HA/DRS cluster setting is missing?
A) Disable Automation Level on all CVMs.
B) Enable EVC for the cluster.
C) Disable VM Monitoring on all CVMs.
D) Enable Host Monitoring.
3. An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:
* 5xAIX hosts
* 3x Hyper-V hosts
* 9xESXi hosts
* 2x physical SQL Clusters (Windows Server 2012R2 hosts)
After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)
A) Migrate the ESXi and Hyper-V workloads using Move.
B) Deploy Volumes to support the AIX and SQL workloads.
C) Deploy Files to support the AIX hosts.
D) Migrate the ESXI workloads to AHV using Move.
4. During a pre-engagement call, a customer explains that network cables are missing from the boxes. The consultant examines the bill of materials more closely to verify the quantity and type required by the hardware. The rack is already equipped with one OOBM Ethernet switch and two 10GbE SFP+ ToR switches.
Which cables should the consultant recommend to the customer for implementing in this scenario?
A) Six lOGbE cables
B) Six Ethernet Cat7 cables
C) Three DAC 10GbE cables and 3 Ethernet cables
D) Six DAC 10GbE cables and 3 Ethernet cables
5. A consultant is working on an expansion project for a customer that has an existing 7-node RF2 cluster. The customer has purchased four more nodes to add to the cluster. All of the hardware is identical between the existing hardware and newly purchased hardware.
Currently, the 7-node cluster has the following utilization:
*CPU: 48%
*Memory: 66%
*Storage: 91%
During the kick-off call, the customer mentioned they'd like to reserve storage capacity on the cluster if a node were to fail in the future.
What's the safest and best way to implement this on the cluster?
A) Enable HA reservation and expand the cluster with the additional nodes.
B) Expand the cluster with the additional nodes and enable Reserve Rebuild Capacity.
C) Expand the cluster with the additional nodes and enable HA reservation.
D) Enable Reserve Rebuild Capacity and expand the cluster with the additional nodes.
質問と回答:
| 質問 # 1 正解: B | 質問 # 2 正解: D | 質問 # 3 正解: A、B | 質問 # 4 正解: D | 質問 # 5 正解: B |














903 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。