Infosys AS-TFINCTAPLIXM2001-FTXA200 Core Technical 認定 TFINCTAPLIXM2001 試験問題:
1. MahaReport Template is:
A) Non-descriptive and procedural
B) Descriptive and non-procedural
C) Descriptive and procedural
D) Non-descriptive and non-procedural
2. Report can be generated in SSO for the following ________________________.
A) All the options
B) Role based
C) User based
D) Audit activities
3. FCSE is a tool for:
A) Tuning the database
B) Reading the configuration information from a centralized Configuration Service
C) All the options
D) Starting all Finacle Core services
4. Which of the following are the action statements that are not supported by MRT
A) NEXTPAGE
B) EXECUTE
C) LINENUMBER
D) PRINT
5. Which of the following statements are key features involved in 24x7 functionality?
i.It separates the end-of-day (EOD) and business date change process.
ii.Batch jobs processing logic for reducing dependency on EOD or BOD and enable
automatic execution of batch processes from an external scheduler.
iii.Use LSIS only for network fallback.
iv.Use Central Stand-in Server (CSIS) only for planned down times, wherever ORACLE RAC is not supported.
A) (i), (ii) and (iii)
B) (i), (ii) and (iv)
C) (i), (iii) and (iv)
D) (ii), (iii) and (iv)
質問と回答:
質問 # 1 正解: B | 質問 # 2 正解: A | 質問 # 3 正解: B | 質問 # 4 正解: C | 質問 # 5 正解: A |